- Joined
- Mar 16, 2003
I have a meanwell and an MCW5000-PT and i'd like to set it up so the TEC gets power from the meanwell when I power up my system. I have this pump relay switch...
http://www.atacom.com/program/print...WAMC_WAVC_WAKI_WAAC&Item_code=WAAC_SWFT_PR_S2
Is there a way I can rig this up to power my TEC when I power up my comp w/truepower 550? Basically, I'd like the meanwell to engage when the truepower engages. If you have any ideas please let me know!
Also, I don't have a pump yet, but when I get one can I wire it to the truepower so that the meanwell is dedicated? Or should I just wire it to the meanwell, cause pumps don't draw much power?
I appreciate any ideas.
http://www.atacom.com/program/print...WAMC_WAVC_WAKI_WAAC&Item_code=WAAC_SWFT_PR_S2
Is there a way I can rig this up to power my TEC when I power up my comp w/truepower 550? Basically, I'd like the meanwell to engage when the truepower engages. If you have any ideas please let me know!
Also, I don't have a pump yet, but when I get one can I wire it to the truepower so that the meanwell is dedicated? Or should I just wire it to the meanwell, cause pumps don't draw much power?
I appreciate any ideas.