- Joined
- Jun 27, 2002
- Location
- Jungle is MASSIVE
Problem: outlets on the danner I have are toolarge to stretch my tubingover and too small to put the tubing into.
What do you think of attaching a 3/8 barb(cut in half) with JB weld?
Its pretty strong stuff, but it would be barbs end to end with a big glob of the weld.....?
or any better ideas? by the way i cant remove the existing barbs on the pump as they are not comming off thanks to....JBWELD.
What do you think of attaching a 3/8 barb(cut in half) with JB weld?
Its pretty strong stuff, but it would be barbs end to end with a big glob of the weld.....?
or any better ideas? by the way i cant remove the existing barbs on the pump as they are not comming off thanks to....JBWELD.