- Joined
- May 4, 2003
- Location
- Monkeys
Ok ive got all my components for watercooling and Ive done the leak test(no leaks ). So when i install my waterblock do i need to take out all my PC components ie mobo ect... and then install the pump, rad, and waterblock? Or should i install everything without taking my PC apart? I have a Maze4 SHD so im guessing i shouldnt need to take everything out cause i dont need to mount my WB with screws through the mobo. Also should i totally empty the water out of my system before installing it? Sorry about the stupid questions but i want to make sure i do it 100% correct.
~Thanks a bunch
Brandon.
~Thanks a bunch
Brandon.