- Joined
- Oct 16, 2003
- Location
- Beer Sheva, Israel
I have finally constructed my WC setup and its currently leak testing. My question is how much time is considered enough? 24h? 12h?
As you can see from the pic its quite ghetto, the worst part is that Chevette core where I used ultra rubbery tubing to strech it over the big barbs and then used a cone type connector to connect it to 1/2' tube but hey it works
You can also see the self made hold down plate for the WW, D-tek want 12$+shipping for it BAH.
As you can see from the pic its quite ghetto, the worst part is that Chevette core where I used ultra rubbery tubing to strech it over the big barbs and then used a cone type connector to connect it to 1/2' tube but hey it works
You can also see the self made hold down plate for the WW, D-tek want 12$+shipping for it BAH.