- Joined
- Oct 7, 2006
Ok so i ordered the parts necessary to wc my rig (the one i have in the Project Logs). Here's a list though:
Pump: MCP655
Res: Swiftech Micro MCRES
Tubing: 1/2" ID Tygon
Rad: Black Ice GT Stealth 240
CPU: Swiftech Storm
So here's the deal, right now I have the above parts on order (waiting for delivery) and have 2 of the Radiators. My plan with the mod was to run both radiators simultaneously. Basically one barb on the rad outputs to the other rad and then the loop continues from there. Does any see any problem with this?
My reason for this is i am going for silence, I don't have room for a triple so i decided on 2 doubles, also i'll be cooling either an 8800 GTS or an 8800 GTX.
As for the flow i was planning on going from Res -> Pump -> Rad's -> CPU -> GPU. Does that look alright as well? Is there anything I should watch out for? Thanks for the input, and yes i read the stickies. lol.
Pump: MCP655
Res: Swiftech Micro MCRES
Tubing: 1/2" ID Tygon
Rad: Black Ice GT Stealth 240
CPU: Swiftech Storm
So here's the deal, right now I have the above parts on order (waiting for delivery) and have 2 of the Radiators. My plan with the mod was to run both radiators simultaneously. Basically one barb on the rad outputs to the other rad and then the loop continues from there. Does any see any problem with this?
My reason for this is i am going for silence, I don't have room for a triple so i decided on 2 doubles, also i'll be cooling either an 8800 GTS or an 8800 GTX.
As for the flow i was planning on going from Res -> Pump -> Rad's -> CPU -> GPU. Does that look alright as well? Is there anything I should watch out for? Thanks for the input, and yes i read the stickies. lol.