I have the following parts coming in my new E6600 in my Lian PC75 W/C conversion
Danger Den Black Ice Xtreme III Radiator (Triple 120s)
Swiftech Apogee GT Block
Swiftech MCP655
Swiftech MCRES-MICRO™ Reservoir
Components for a T-Line (Perhaps redundant with a reservoir but makes things easier to fill and drain and I add on gpu blocks)
Whats the best sequence to have this system in?
I'm thinking:
CPU block
T-Line
Pump
Resevior
Radiator
Thanks
Danger Den Black Ice Xtreme III Radiator (Triple 120s)
Swiftech Apogee GT Block
Swiftech MCP655
Swiftech MCRES-MICRO™ Reservoir
Components for a T-Line (Perhaps redundant with a reservoir but makes things easier to fill and drain and I add on gpu blocks)
Whats the best sequence to have this system in?
I'm thinking:
CPU block
T-Line
Pump
Resevior
Radiator
Thanks