View Full Version : Re-doing my water setup.
apintojr
04-10-08, 11:06 AM
ok, well even though i just re-did my setup couple weeks ago after getting a new cpu block, i decided to change my setup do to a little leakage problem. every since i started using 1/2" tubing with the thin walls i've had leak issues. going back to 1/2" thick walled stuff. this time i'm gonna go all out, cutting holes on the mobo tray to hide wiring better, any maybe a new paint scheme, i'll just be replacing the tubing, RES, Pump, adding a Fillport.
new items:
MCP655 pump - replacing my MCP355 pump
DD FillPort
1/2" ID x 3/4" OD tubing. - replacing my thinwall tubing
Swiftech MicroRES - replacing my swiftech bay res.
setup as is for now:
http://img.villagephotos.com/p/2006-2/1148500/DSC01828.JPG
apintojr
04-10-08, 12:40 PM
never WC using a Fill Port before. this is how i'm thinking of running the setup. yea yea, my quick paint skill at work =P
http://img.villagephotos.com/p/2006-2/1148500/untitled1111.JPG
dark bishop
04-10-08, 05:57 PM
looks good apintojr. that fill port is where it should be.
never WC using a Fill Port before. this is how i'm thinking of running the setup. yea yea, my quick paint skill at work =P
Paint skills...you have none!
A fill port is usually used with a T-Line, not a rez.
To refill with a raz you'd just remove the cap and pour in the coolant.
apintojr
04-11-08, 01:36 PM
yeah, i know but i want the res in there for the look. so i see you want to Paint Battle. lol that was a quick drawup before my boss came in =)
yeah, i know but i want the res in there for the look. so i see you want to Paint Battle. lol that was a quick drawup before my boss came in =)Then like this?
apintojr
04-13-08, 01:51 PM
ok ok, you win. i starting to debate adding the res. what to do. i'll wait till i get everything and figure out the setup.
Conumdrum
04-13-08, 07:12 PM
Okay, here is my last paint attempt, a bit different, but kinda puts you guys to shame. Her arm is resting on a radiator.
http://i245.photobucket.com/albums/gg49/Conumdrum_2007/monalisa.jpg
=ACID RAIN=
04-13-08, 08:00 PM
LMAO.
Yeah I would skip the rez. A foot of T-line will hold enough water for 6 months or more if the plug seals good.
LMAO.
Yeah I would skip the rez. A foot of T-line will hold enough water for 6 months or more if the plug seals good.Forget the fill port, just use a marble!
apintojr
04-14-08, 12:49 PM
i decided, no res. i got a swiftech micro res, and its really not fitting into place where i wanted it, so i'm scratching it. just have to finish my mobo tray holes and fill port holes and i'll be good to go.
apintojr
04-15-08, 12:26 AM
so far this is how im running my T-line. bad? good?
pics (http://www.villagephotos.com/pubbrowse.asp?folder_id=1987532)
apintojr
04-15-08, 08:20 AM
*bump* =)
apintojr
04-16-08, 12:21 PM
well its filled. still need to wiring stuff up. waiting on my fan controller to come in before i finish. and yea, i noticed big time it's gonna be a pain to bleed with a T-line. almost instantly i noticed it =( but i like.
http://img.villagephotos.com/p/2006-2/1148500/0416081203.jpg
vBulletin® v3.8.7, Copyright ©2000-2012, vBulletin Solutions, Inc.