- Thread Starter
- #21
this is the hx. outter pipe is where the liquid r290 boils cooling.
there is 2 lengths of 3/8 in there for the suction line and 2 lengths of 1/4" pipe. i joind the ends by drilling into 1/2 pipe and brazing it all up with lots of brazing rods.
ie 3 sets of pipes.
there is 2 lengths of 3/8 in there for the suction line and 2 lengths of 1/4" pipe. i joind the ends by drilling into 1/2 pipe and brazing it all up with lots of brazing rods.
ie 3 sets of pipes.