- Joined
- Aug 29, 2007
I'm putting together my very first WCing loop in my new system, and I'm looking for as much help as I can get, I cannot afford to screw this up. I've been following MaxxXRacer's guide here. I just recieved the bulk of my HW, and I've been cleaning and prepping.
This is what I am planning:
Here are all the parts:
CPU block - Swiftech Apogee GTX CU
NB block - Asus Maximus Extreme (Fusion Block System)
Pump - Swiftech MPC350
Radiator - Swiftech MCR320-QP-K
Reservoir - EK-Multioption RES 150 rev.2
Tubing - Tygon® Silver Antimicrobial 3/8" ID - 1/2" OD
How about an alcohol bath?
This is why I cleaned the CPU block
Only problem I've had so far is that the EK RES has a crack, so I'll be sending that back to Jab-Tech for an exchange. When it returns, I'll be out of town, and will continue when I return (mid August). Unitl then, any comments or suggestions?
I do have one question, will I have trouble feeding/flushing the loop due to my rad being at the top of my loop (it'll be about level with the fill port)?
This is what I am planning:
Here are all the parts:
CPU block - Swiftech Apogee GTX CU
NB block - Asus Maximus Extreme (Fusion Block System)
Pump - Swiftech MPC350
Radiator - Swiftech MCR320-QP-K
Reservoir - EK-Multioption RES 150 rev.2
Tubing - Tygon® Silver Antimicrobial 3/8" ID - 1/2" OD
How about an alcohol bath?
This is why I cleaned the CPU block
Only problem I've had so far is that the EK RES has a crack, so I'll be sending that back to Jab-Tech for an exchange. When it returns, I'll be out of town, and will continue when I return (mid August). Unitl then, any comments or suggestions?
I do have one question, will I have trouble feeding/flushing the loop due to my rad being at the top of my loop (it'll be about level with the fill port)?