I'm still speechless.
I'm completely done with DI for any serious benching. So far the only lead I've ever gotten on LN2 back in MA was
around 300 bucks for 120L (IIRC). For one or two benches a year, it almost makes sense...you just gotta have it all done right at once, very little room for error, which is a huge issue for me but clearly no problem for you.
gautam you would be surprized how far 25 liters will go when i get it there is around 3 guys benching and it lasts all day and we all chip in
but it does drive you nuts when ya hardware packs in and you have it there just evaping into thin air
@max cascade cooling was a dream for me i had to drop out of benching for a year but with cascade 3 underway i will have a chance to bench again ln2 is great stuff but unless you are right on top of ya game can be very frustrating
and if things go wrong its not there the next day
a cascade will just start up and run when ever you have the time to bench
and as i am a slow bencher that needs more time when benching a cascade was the only way for me