- Joined
- Sep 20, 2006
What does this mean? (probably something simple, it's driving me CRAZY!!) I'm using the SMP F@H client with Ubuntu 64 6.06 LTS, for a 64 bit PC on a manufactured CD, for an Athlon 64 X2 4200+, stock GHz, 1 GB DDR 400
[06:25:47] CoreStatus = 64 (100)
[06:25:47] Sending work to server
[06:25:47] - Error: Length of work/wuresults_01.dat (7673739) exceeds packet lim it set (5241856)
[06:25:47] - Error: Could not transmit unit 01 (completed November 25) to work s erver.
[06:25:47] - 1 failed uploads of this unit.
[06:25:47] Keeping unit 01 in queue.
[06:25:47] Trying to send all finished work units
[06:25:47] - Error: Length of work/wuresults_01.dat (7673739) exceeds packet lim it set (5241856)
[06:25:47] - Error: Could not transmit unit 01 (completed November 25) to work s erver.
[06:25:47] - 2 failed uploads of this unit.
[06:25:47] - Error: Length of work/wuresults_01.dat (7673739) exceeds packet lim it set (5241856)
This is the second time this bull has happened. What's going on? I'm getting tired of completing WU's and then not being able to send them in for credit. The first time it happened I deleted everything and started over again as per this Web site: http://folding.stanford.edu/FAQ-SMP.html
Edit: I'm folding on an Athlon 64 3000+ and a PD 805, both with absolutely "NO PROBLEMO's ".These two machines are using WinXP and the 4200 is using Ubuntu 64. I wish they made a SMP client for Winders. (all copies of Winders bought, paid for and activated)
[06:25:47] CoreStatus = 64 (100)
[06:25:47] Sending work to server
[06:25:47] - Error: Length of work/wuresults_01.dat (7673739) exceeds packet lim it set (5241856)
[06:25:47] - Error: Could not transmit unit 01 (completed November 25) to work s erver.
[06:25:47] - 1 failed uploads of this unit.
[06:25:47] Keeping unit 01 in queue.
[06:25:47] Trying to send all finished work units
[06:25:47] - Error: Length of work/wuresults_01.dat (7673739) exceeds packet lim it set (5241856)
[06:25:47] - Error: Could not transmit unit 01 (completed November 25) to work s erver.
[06:25:47] - 2 failed uploads of this unit.
[06:25:47] - Error: Length of work/wuresults_01.dat (7673739) exceeds packet lim it set (5241856)
This is the second time this bull has happened. What's going on? I'm getting tired of completing WU's and then not being able to send them in for credit. The first time it happened I deleted everything and started over again as per this Web site: http://folding.stanford.edu/FAQ-SMP.html
Edit: I'm folding on an Athlon 64 3000+ and a PD 805, both with absolutely "NO PROBLEMO's ".These two machines are using WinXP and the 4200 is using Ubuntu 64. I wish they made a SMP client for Winders. (all copies of Winders bought, paid for and activated)
Last edited: