rcillig

Member
Joined
Jan 2, 2003
Location
Nebraska USA
I'm redoing my set up right now and want to add a fil tube is there a certain place I should cut in the T for the fill tube that is better than others? I was thinking of adding it on the out flow side of the pump or should i go onto the inlet side?
 
It's kinda the first rule, fill line/res before pump. Keeps pumps from running dry during filling etc. Never after the pump, it will blow water out the top of the line.
 
i believe the top of the micro res (assuming your keeping it in the loop) is G1/4 so you can add a barb then get a fill port.

if your not keeping the res then the t line must be before the pump as said.
 