- Joined
- Oct 5, 2013
- Thread Starter
- #41
UPDATE 8
I continued with completing and it is almost complete. Only left to cut holes for cables and drill holes for tubing.
EKWB, ASUS and Bitspower = TOP!
Detail of connect from ram block to the cpu block.
Reservior + pump holder (TOP) on his place.
Connected from reservior/pump to the 240 radiator and from this rad to the 480 radiator which is down.
Overall view - only left to connect tubing into GPU's
I continued with completing and it is almost complete. Only left to cut holes for cables and drill holes for tubing.
EKWB, ASUS and Bitspower = TOP!
Detail of connect from ram block to the cpu block.
Reservior + pump holder (TOP) on his place.
Connected from reservior/pump to the 240 radiator and from this rad to the 480 radiator which is down.
Overall view - only left to connect tubing into GPU's