Thank you, i am getting close, real close.
Installed my (so far unseen) fan controller, which shall serve as (also unseen) LED light control. It was cheap, and does the job, just not as well as i had hoped, and will in future be replaced by a Lamptron or something similar.
My Aquaero 6 Pro was installed, still need to sort out wiring, but its getting there.
I finished off my 2 PWM fans that shall cool the VRM parts of the GPU's.
I have ordered 2x 30cm straight to straight round sata cables (already have 2x 20cm)
My new (used) Samsung Evo 250Gb SSD is waiting for me at the post office.
Looped is aired out, but need more white fluid for it, that will come in time, its good enough to run for the time being.
All fans are ready, sleeved and all. It honestly is just the paracord now. Everything else is ready to go. Yesterday, the pump on my 2nd rig died, turned out its an issue with the fan controller i was running off, so now i have my work to do there aswell.. So its getting to a point where i just want this done.