i want high performance and am already looking at around $400-500 for the setup. Here is my list so far with links:
Pump - Swiftech MCP600 12v Water Pump Rev. 2 - $80
http://www.frozencpu.com/cgi-bin/frozencpu/ex-pmp-15.html
Radiator - double Heater Core with shroud 1/2" - $50
http://www.dangerden.com/mall/Radiators/heatercore.asp
Reservoir - Blue UV Reactive Tundra Dual 3.5" Bay Reservoir - $30
http://www.frozencpu.com/cgi-bin/frozencpu/ex-res-35.html
Tubing - UV Blue Tubing $2.25 per Foot (15ft) - $27
http://www.dangerden.com/mall/Misc_Hardware/tubing_clamp.asp
CPU block- DDen RBX - $61
http://www.dangerden.com/mall2/more_block3.asp?fmmore=234
NB block -Graph-O-Matic Rev2.0 VGA/Chipset-$45
http://www.highspeedpc.com/Merchant2/merchant.mv?Screen=CTGY&Store_Code=HSPC&Category_Code=VGA2
GPU block - Cool-Matic ATI rev1.5 - $105
http://www.highspeedpc.com/Merchant...GY&Store_Code=HSPC&Category_Code=CoolmaticATi
Arctic Silver 5 - 2 tubes @ 7.29 - $15
Total - $413
That is not including fittings, clamps, etc. Also any comments on the setup are welcome. My main worries though are getting the blocks all converted to 1/2" barbs. If the block is....say....3/8" and i switch out the barbs with 1/2" ones will the size of the channels inside the block cause any problems? and if so, any major problems?